Sea-to-Sky Highway Improvement Project
A GUIDE TO THE IMPROVEMENTS BY SECTION

Click below to go to a page highlighting each section.

Whislter's Function Junction Squamish Britannia Beach Furry Creek Lions Bay West Vancouver


WEST VANCOUVER

West Vancouver

The southern portion of the Sea-to-Sky Highway Improvement Project begins in West Vancouver. Work in the West Vancouver section includes the Eagleridge Interchange which connects the newly constructed section of highway from Eagleridge to join with the highway 4.6 km north, at the North Junction. This new section connects with the Ansell Place to Lions Bay section providing 12 km of improved highway. From West Vancouver through Lions Bay, the improved highway will consist of 4-lane sections with continuous median barrier.

WHAT WE’RE IMPROVING

The link below provides access to the final phase of consultation. The detailed design consultation covered specific treatments related to the final design improvements, including traffic calming and noise reduction features, lighting and other aesthetic treatments. This phase of consultation included gathering community feedback and input regarding community gateway signage, the cycling path, and landscaping plans.

http://www.seatoskyimprovements.ca/Detailed_
Design/West_Vancouver/WVDD_Discussion_Guide.pdf

The following links present a virtual tour of the North Junction and Eagleridge Interchange as well as animated models of traffic movements at each location.

Sea-to-Sky Highway Virtual Tour

AVI version (29.3 MB) | MOV version (47.28 MB) | WMV version (7.8 MB)


Model of Eagleridge Interchange Traffic Movements

AVI version (7.71MB) | MOV version (61 MB) | WMV version (3.6 MB)


Model of Traffic Movement at North Junction

AVI version (4 MB) | MOV version (73 MB) | WMV version (5.6 MB)


Browser plugins to run the above formats can be found here.

 

Back to top

 

FEATURES

Eagleridge Interchange

 

Eagleridge Interchange

 

North Junction

 

North Junction

 

North Junction

The Eagleridge Interchange in West Vancouver separates Sea-to-Sky traffic from Horseshoe Bay Village and the BC Ferries Terminal.

 

North Junction

North Junction

 

North Junction

 

North Junction

The North Junction is where the newly-constructed highway from Eagleridge Drive in the south, joins the re-built old highway north of Horseshoe Bay. Improvements at this location include a new ‘flyover’, allowing northbound traffic from Horseshoe Bay Village to proceed north and connect with the improved highway.

 

The link below shows how the elements of construction tie the North Junction together when complete.

http://www.seatoskyimprovements.ca/updates/2008/080522_NJunctionPreview.pdf

 

Back to top

COMPLETED WORK

roundabout

 

Larsen Creek Bridge

 

Retaining Wall Construction

 

Rock Cuts and Stabilization Work

 

Howe Sound

 

Retaining Walls

 

Retaining Wall Construction

 

Retaining Wall Construction

 

Retaining Wall Construction

 

Retaining Wall Construction

 

Retaining Wall Construction

 

Retaining Wall Construction

Views of the newly-constructed section between West Vancouver’s Eagleridge Interchange on the south and the North Junction to the north. This four-lane divided highway reduces congestion and improves reliability on a highly-travelled, multi-destination section of the route. It safely separates traffic heading to Sea-to-Sky country, BC Ferries, Horseshoe Bay Village or Eagleridge Drive. As well, the new section moves up to 13,000 vehicles per day away from Eagleridge community and school.

The segment has improved sightlines, widened paved shoulders to accommodate cyclists and emergency pull-offs. Centre median barriers prevent head-on collisions. Additional safety improvements include the use of highly reflective pavement markings, representing the most advanced technology and highest safety standards available in highway markings. Rumblestrips warn drivers they are out of their lane, and roadside reflectors improve visibility.

 

Retaining Wall Construction

Improvements through Lions Bay.

SCHEDULE

http://www.seatoskyimprovements.ca/updates/2008/080409_STS_timetable.pdf

 

Back to top